Three weeks of work.
Rejected in eleven seconds.

The 42-point submittal checklist: what a reviewer looks for before you ever see the stamp, written by a structural engineer who has sat on the reviewing side of the table. Print it. Share it. Run it before every package leaves your desk.

A rejected submittal costs a second review cycle, hours of reassembly, and the schedule that was waiting on the approval. Almost every rejection on this list takes under two minutes to prevent.

42 checks, 7 stages

A · 7 CHECKS
Before you assemble

Most rejections are decided before the first page is scanned.

B · 5 CHECKS
The transmittal and cover

The first page decides the reviewer's mood for the next fifty.

C · 8 CHECKS
Product data

Can the reviewer find the specified value on your page?

D · 7 CHECKS
Shop drawings

Connections, anchors, embeds - what the EOR is actually reviewing.

E · 6 CHECKS
Cross-document coordination

The rejections that hurt most hide between documents.

F · 4 CHECKS
Deviations and substitutions

A hidden deviation costs the rejection and the trust.

G · 5 CHECKS
The last pass

Ten minutes here saves three weeks there.

Pick your edition

Project Engineer

The pre-send discipline that ends the Revise-and-Resubmit cycle.

Download PDF
Project Manager

The cheapest schedule float you will ever buy back is a two-minute check.

Download PDF
Contractor

Every rejection delays your money. This is what the stamp is waiting for.

Download PDF

"Can the reviewer approve this without asking a single question?"
If the answer is no, you already know what the comment will be. Fix it now, while it is free.

Want your rejection risk scored before you send?

The free Risk Score asks 14 questions about how your packages actually get built and shows exactly where the exposure lives. Two minutes, engineer-built, no upload needed.