The 42-point submittal checklist: what a reviewer looks for before you ever see the stamp, written by a structural engineer who has sat on the reviewing side of the table. Print it. Share it. Run it before every package leaves your desk.
Most rejections are decided before the first page is scanned.
The first page decides the reviewer's mood for the next fifty.
Can the reviewer find the specified value on your page?
Connections, anchors, embeds - what the EOR is actually reviewing.
The rejections that hurt most hide between documents.
A hidden deviation costs the rejection and the trust.
Ten minutes here saves three weeks there.
The cheapest schedule float you will ever buy back is a two-minute check.
Download PDF"Can the reviewer approve this without asking a single question?"
If the answer is no, you already know what the comment will be. Fix it now, while it is free.